1. Offshore Drilling Contractor Avoids Costly Delay with Rapid PSL 3 Delivery
Challenge:
An international offshore drilling contractor was facing a shutdown on a subsea BOP (blowout preventer) installation due to missing PSL 3-certified bolting. Their original supplier had overpromised on lead times and failed to deliver fully compliant fasteners with the required documentation. The rig was at risk of significant downtime—costing hundreds of thousands of dollars per day.
Solution:
NP Energy was called in as a last-minute alternative. Their team:
- Verified technical specs from the client’s engineering team
- Sourced PSL 3-certified B7 fasteners from an approved manufacturer
- Coordinated 3rd-party NDT and witness testing
- Delivered complete MTRs, CoCs, and dimensional reports
- Arranged expedited shipping to the staging yard in less than 72 hours
Outcome:
The rig avoided extended downtime and passed inspection on time. The client praised NP Energy for “saving the project” and has since integrated them into their standard vendor list for critical equipment fasteners.
2. Midstream Pipeline Project Gains Efficiency with Custom Flange Kits
Challenge:
A midstream construction firm building a 250-mile pipeline across the Southwest was struggling with delays and confusion due to loose, bulk shipments of bolting materials. Field crews were wasting valuable time sorting, inspecting, and matching bolts to flanges—resulting in errors, lost parts, and mounting labor costs.
Solution:
NP Energy collaborated with the contractor’s procurement and engineering teams to:
- Review all piping isometrics and flange drawings
- Pre-package flange bolting kits by tag number
- Include color-coded labels, full documentation packets, and QR-coded MTRs
- Ship kits in palletized containers for each construction segment
Outcome:
The field crews reported a 30% reduction in installation time, with zero material errors. The client also improved QA/QC traceability and documentation for their final turnover packages. NP Energy now supports their maintenance team with similar kits for MRO use.
3. Global EPC Saves Time and Cost on Refinery Turnaround
Challenge:
A major global EPC (Engineering, Procurement, and Construction) firm managing a scheduled refinery turnaround in the Gulf Coast region required PSL 2 bolting in multiple sizes and grades. Their challenge: sourcing compliant materials within a tight two-week window—and with complete traceability for refinery inspection teams.
Solution:
NP Energy provided:
- Immediate access to in-stock PSL 2 bolts and nuts in Grades B7 and L7
- Supplemented supply with express-manufactured items from domestic partners
- Organized MTRs, NDT results, and heat treatment records into digital packets
- Delivered pre-labeled kits sorted by refinery system (e.g., exchanger, reactor, valve flanges)
Outcome:
The refinery completed its turnaround on schedule, passing inspection without a single documentation deficiency. NP Energy’s speed and accuracy earned the EPC’s confidence, resulting in a long-term supply contract for their maintenance operations.
4. Hydrogen Pilot Plant Relies on NP Energy for Specialty Alloy Bolting
Challenge:
A U.S.-based energy company launching a hydrogen pilot plant required API 20E PSL 2 bolting—but with an added twist: the fasteners had to be made from Inconel 718, due to the high-temperature, high-pressure environment within hydrogen compressors. Their previous vendor had no experience sourcing this material to API 20E standards.
Solution:
NP Energy’s technical team:
- Identified an API 20E-approved manufacturer capable of machining Inconel 718
- Oversaw heat treatment, hardness testing, and NDT protocols
- Coordinated 3rd-party inspection and verification
- Provided digital documentation for grant compliance and audit readiness
Outcome:
The hydrogen unit was commissioned on time, and the client was able to fulfill both technical and ESG-related documentation for regulators and funding agencies. NP Energy has since become a key partner as the company expands into clean energy.
5. Fabrication Yard Streamlines QA with NP Energy Documentation System
Challenge:
A Texas-based fabrication yard serving offshore equipment OEMs was consistently delayed during final QA checks due to incomplete or missing bolting documentation. MTRs were arriving late, test records were disorganized, and project deadlines were being missed.
Solution:
NP Energy implemented a streamlined approach:
- Built a documentation tracker tied to each bolting PO and heat lot
- Delivered all MTRs, NDT reports, and CoCs digitally, in organized folders by flange tag
- Included QR codes on packaging to access documents instantly in the field
- Set up a shared portal for real-time access by the client’s QA team
Outcome:
The fabrication team reduced QA closeout time by 40% and passed all third-party inspections on the first attempt. They credited NP Energy with making bolting documentation “one less thing to worry about.”
6. International Operator Secures Long-Term Maintenance Supply
Challenge:
An international oil and gas operator managing multiple platforms in West Africa needed a long-term, reliable supply of API 20E PSL 2 bolting to support maintenance across compressors, valves, and pressure control systems. Their current vendor had inconsistent lead times and fluctuating quality.
Solution:
NP Energy proposed a strategic supply program:
- Stocked pre-approved flange kits in regional warehouses
- Established quarterly forecasts with the client’s planning team
- Created custom documentation templates for local inspection teams
- Coordinated export packaging and compliance with local customs regulations
Outcome:
The operator now receives on-demand access to compliant bolting, without delays or rework. They’ve reduced emergency air freight shipments by 80% and improved inspection scores across all platforms.
7. LNG Facility Prevents Installation Error with Technical Support
Challenge:
An LNG facility undergoing an expansion project contacted NP Energy with concerns about flange bolting torque specs and whether the bolts on order would meet corrosion-resistance requirements in a coastal environment.
Solution:
NP Energy:
- Reviewed the project specifications and provided a side-by-side comparison of B7 vs. B8M material grades
- Advised on the use of PTFE-coated B7M fasteners for optimal performance
- Confirmed compliance with NACE MR0175 standards
- Delivered pre-assembled kits with torque values marked for field technicians
Outcome:
The client avoided a potentially expensive rework scenario and installed bolting assemblies with complete confidence. NP Energy’s fast response and engineering guidance reinforced their reputation as a technical partner, not just a supplier.
Why Clients Choose NP Energy Again and Again
Across every success story, several key themes emerge—what sets NP Energy apart:
Technical Expertise
From PSL 1 to PSL 3, NP Energy understands API 20E inside and out. Clients rely on their guidance for materials, coatings, inspection, and performance.
Documentation Precision
NP Energy ensures complete, organized, and audit-ready documents—MTRs, CoCs, NDT reports—so clients pass inspections the first time.
Flexible Solutions
Whether it’s flange kits, exotic materials, or custom packaging, NP Energy tailors each order to the project’s needs.
Speed and Reliability
With in-stock inventory, strong manufacturer relationships, and expedited logistics, NP Energy keeps projects on track—even under pressure.
Customer-Centric Support
Clients receive responsive service, clear communication, and a partner that sees beyond the PO.